Pay in 4 interest-free payments of $2.50 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 22 - Aug 27
Pay in 4 interest-free payments of $2.50 Learn more
Ships within 48 hours · Estimated delivery Aug 22 - Aug 27
Once the switch has been moved to the new position it will remain there until a drive pulse appears on the drive coil for the other path
Excellent Single Mode Beam Quality for 1 μm Applications
The coupler is a 1x2 C+L-band 1530 nm to 1605 nm
Lead Time: 3 Weeks
Senko LCU (Blue) Acousto-Optic Modulator Once the switch has beenFEATURESCompact Design RJ 45 Style Interface Simplex and Duplex Type Available Telcordia, ANSI, TIA EIA, and IEC Compliance* Color Coding High Precision Alignment with Zirconia Sleeve or Metal Sleeve Lead Time: 2 3 Weeks Datasheet
US$ 115.00
US$ 115.00
US$ 115.00
US$ 115.00
US$ 115.00
US$ 125.00